Vesgantti 38.5" Accent Chair Dark Blue, Comfy Corduroy Single Sofa Seat by Vesgantti

Vesgantti 38.5" Accent Chair Dark Blue, Comfy Corduroy Single Sofa Seat

$280.48
Sale price  $280.48 Regular price 
Skip to product information
Vesgantti 38.5" Accent Chair Dark Blue, Comfy Corduroy Single Sofa Seat by Vesgantti

Vesgantti 38.5" Accent Chair Dark Blue, Comfy Corduroy Single Sofa Seat

$280.48
Sale price  $280.48 Regular price 
Shipping calculated at checkout.
Details

Product Overview

From the materials to the finish, the Vesgantti 38.5" Accent Chair Dark Blue, Comfy Corduroy Single Sofa Seat with Spring Cushion, Upholstered Armchair with Deep Seat, Reading Chair for Adults, Modern Sofa for Living Room, Bedroom reflects ergonomic choices that support everyday usability in living rooms. measuring 31.5"D x 38.5"W x 35"H, weighing 440 Pounds, available in 38.5" - 1 Seater Dark Blue. Notable features include modern armchair and armchair sofa, contributing to its comfortable character.

Key Features

  • Modern Armchair Sofa - This versatile single-seater sofa effortlessly complements living rooms, bedrooms, or studies, featuring a sleek silhouette that harmonizes with both contemporary and traditional decor. Its minimalist design ensures seamless integration into any space, making it a stylish yet functional addition to diverse interior aesthetics
  • Ergonomic & Comfortable - The spring cushions of this reading chair absorb the impact of daily use, preventing rapid wear and tear and extending the life of the footstool. With a 20.9-inch seat depth, its generously sized seat offers ample support for both sitting and propping up feet, enhancing relaxation with exceptional pressure relief that makes every moment feel effortlessly luxurious
  • FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This accent chair is known for its sturdiness and solidity, with a maximum weight capacity of 440lbs. Additionally, the single sofa chair features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
  • Durable Corduroy Fabric - This corduroy sofa chair features distinct parallel ridges for a smooth, plush feel. Its velvety surface and modern design exude luxury, while the thick, wear-resistant build ensures lasting comfort. Available in four colors—note slight hue variations due to monitors and lighting
  • Easy Assembly - Complete with tools and detailed instructions, assembly is quick and easy. Color/size may vary slightly due to display/manual measurement. Upon unpacking, cushions may appear compressed; allow 24-48 hours to fully fluff. Pat gently for faster recovery and enhanced comfort. Contact us with questions

Why Choose the Vesgantti 38.5" Accent Chair Dark Blue

Picking the Vesgantti 38.5" Accent Chair Dark Blue, Comfy Corduroy Single Sofa Seat with Spring Cushion, Upholstered Armchair with Deep Seat, Reading Chair for Adults, Modern Sofa for Living Room, Bedroom means choosing minimalist engineering with long-term durability. The modern armchair reinforces its position in the sofas & couches space.

Best For

The Vesgantti 38.5" Accent Chair Dark Blue, Comfy Corduroy Single Sofa Seat with Spring Cushion, Upholstered Armchair with Deep Seat, Reading Chair for Adults, Modern Sofa for Living Room, Bedroom pairs naturally with small spaces situations, offering simple assembly when it counts.

Quick Summary

The Vesgantti 38.5" Accent Chair Dark Blue is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 20.9 inches. Seat Height: 7 Inches. Weight Limit: 440 Pounds. Price: $280.48.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Seat Depth 20.9 inches
Seat Height 7 Inches
Weight Limit 440 Pounds
Seating Capacity 1.0
Product Dimensions 31.5"D x 38.5"W x 35"H
Item Weight 64 Pounds
Type Standard
Color 38.5" - 1 Seater Dark Blue

Materials + Care

We prioritize quality in selecting the materials for our items, choosing premium fabrics and finishings that ensure durability, comfort, and timeless appeal.

Shipping + Returns

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.

You might also like...