Product Overview
Practical versatile design meets lasting comfort in the Vesgantti 38.5" Accent Chair Dark Gray, Comfy Corduroy Single Sofa Seat with Spring Cushion, Upholstered Armchair with Deep Seat, Reading Chair for Adults, Modern Sofa for Living Room, Bedroom, made for bedrooms. measuring 31.5"D x 38.5"W x 35"H, weighing 64 Pounds, available in 38.5" - 1 Seater Dark Gray. Notable features include modern armchair and armchair sofa, contributing to its multi-functional character.
Key Features
- Modern Armchair Sofa - This versatile single-seater sofa effortlessly complements living rooms, bedrooms, or studies, featuring a sleek silhouette that harmonizes with both contemporary and traditional decor. Its minimalist design ensures seamless integration into any space, making it a stylish yet functional addition to diverse interior aesthetics
- Ergonomic & Comfortable - The spring cushions of this reading chair absorb the impact of daily use, preventing rapid wear and tear and extending the life of the footstool. With a 20.9-inch seat depth, its generously sized seat offers ample support for both sitting and propping up feet, enhancing relaxation with exceptional pressure relief that makes every moment feel effortlessly luxurious
- FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This accent chair is known for its sturdiness and solidity, with a maximum weight capacity of 440lbs. Additionally, the single sofa chair features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
- Durable Corduroy Fabric - This corduroy sofa chair features distinct parallel ridges for a smooth, plush feel. Its velvety surface and modern design exude luxury, while the thick, wear-resistant build ensures lasting comfort. Available in four colors—note slight hue variations due to monitors and lighting
- Easy Assembly - Complete with tools and detailed instructions, assembly is quick and easy. Color/size may vary slightly due to display/manual measurement. Upon unpacking, cushions may appear compressed; allow 24-48 hours to fully fluff. Pat gently for faster recovery and enhanced comfort. Contact us with questions
Why Choose the Vesgantti 38.5" Accent Chair Dark Gray
The Vesgantti 38.5" Accent Chair Dark Gray, Comfy Corduroy Single Sofa Seat with Spring Cushion, Upholstered Armchair with Deep Seat, Reading Chair for Adults, Modern Sofa for Living Room, Bedroom provides what serious sofas & couches use demands: sturdy build, modern armchair, and simple assembly that lasts.
Best For
The Vesgantti 38.5" Accent Chair Dark Gray is best suited for: Back Support, Ergonomic, Space Saving, Upholstered.
Quick Summary
The Vesgantti 38.5" Accent Chair Dark Gray is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 20.9 inches. Seat Height: 7 Inches. Seating Capacity: 1. Price: $263.98.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Assembly Required | Yes |
| Seat Depth | 20.9 inches |
| Seat Height | 7 Inches |
| Seating Capacity | 1 |
| Product Dimensions | 31.5"D x 38.5"W x 35"H |
| Item Weight | 64 Pounds |
| Color | 38.5" - 1 Seater Dark Gray |
| Style | Modern |
| Special Feature | Back Support, Ergonomic, Space Saving, Upholstered |